Mitrich.
For the BE5 as it is slightly different set up (solenoid box 1,2,3,5,6,8,10,12) you will only need to change as in GTB diagram:
1,5, and 6
1. this will leave the IC valve open (atmos)
5. this keeps the pressure differential sensor happy (alternative is to block 5 at solenoid box and connect 22 via T piece to 2 or 3)
6. this keeps the ECV open. (neg pressure/vacuum from start up)
if you look at his pictures, he is beyond doing the line swap thing really, the extractor set thing shows he needs a different turbo and just remove the bbod
-smurff
Yes I posted just! after he did!.
Since he is just removing the ECV which makes it easier just block off 6 at the solenoid box and block off where 22 was originally connected (dump pipe)
Please: draw on my design as you'd like, I can not understand!
Enter the details as to GTB